Skip to content
Timesheet Systems

Home  /  All notes

Step 01

Requirements

Four different products share this category name, and the rule engine decides which are viable at all. Plus the requirements that start with "not", which are the ones that get skipped.

10 notes

What You Are Actually Buying

Timesheet products bundle four different systems under one name. Knowing which ones you need decides the shortlist, the price and the integration work.

Explainer

Writing Requirements That Survive

Most requirement documents are a feature checklist copied from a vendor's website. What to write instead so that evaluation means something.

Procedure

The Requirements That Start With Not

Negative requirements are the ones that get skipped and the ones that decide whether a deployment is accepted. What to exclude explicitly, and why.

Reference

Sizing Before Shortlisting

Four numbers change which products are viable and what the licence actually costs. Most evaluations discover them after the shortlist.

Procedure

Who Needs to Be in the Room

Timesheet systems touch pay, law, privacy and daily work at once. Missing any of those voices produces a system that fails in exactly that dimension.

Analysis

Recording Away From a Desk

Field, site and shift workers break assumptions a desk-oriented product is built on. The requirements that only surface when someone tries it in a yard.

Analysis

The Rule Engine

The part of the product that decides whether it can serve you at all, and the questions that reveal its real limits.

Analysis

What the Worker Can See

Accessibility of the record is part of the legal standard in several jurisdictions and a product capability that varies widely. What to require.

Reference

Where to Start

The first ninety days, in an order that produces constraints before it produces a shortlist.

Procedure

Project Attribution

The dimension that serves costing and billing rather than pay, and the design decisions that determine whether the data is usable.

Analysis